Qmar - low-pressure snake foam
Price on request
discount price
net unit price
25,62zł for item
minimum trading quantity
the amount of product
1.00 item
total price
net list price
27,38zł
for 1.00 item
total price
discounted net price
25,62zł
for 1.00 item
price-list
gross unit price 33,68zł
for item
discount price
gross unit price
31,51zł
for item
minimum trading quantity
the amount of product
1.00 item
total price
gross list price
33,68zł
for 1.00 item
total price
gross discount price
31,51zł
for 1.00 item
Product description
The foam is intended for assembly and sealing for specialized assembly groups.
Application
- especially recommended for all types of windows and doors
- thermal insulation of water, sewage and central heating networks
- bonding and insulating wall panels, corrugated sheets, roofing boards, etc.
- soundproofing and sealing of partition walls and car cabins
- joining prefabricated element in wooden frame construction
- thermal insulation roof in and flat roof in
- filling gaps in thermal insulation when insulating buildings
properties
- the foam has extremely good adhesion to smooth and porous surfaces occurring when installing doors and windows: PVC, masonry, concrete, brick, wood, metal and other
- low-pressure formula eliminates frame warping and ensures full gap filling
- has excellent thermal insulation and soundproofing parameters
- cures under the influence of moisture contained in the atmospheric air
- resistant to mold and mildew
Method of use
- Thoroughly clean and degrease the working substrate.
- Before use, make sure the can is positive (optimum +20 C).
- Shake the can well (for about 30 seconds) to thoroughly mix the ingredient in.
- Screw the applicator to the can, the working position for assembly is the can position "to the top".
- Apply foam from below to the gap.
- Fill the joints up to 50% deep, but not more than 5 cm per one layer, wider than 5 cm should be filled in layers,
- Moisten each layer after application with water, e.g. with a sprayer.
- Excess foam after curing should be removed mechanically (e.g. with a knife).
- After full hardening, the foam should be protected against UV rays using plaster, paints, for example.
Technical data
- apparent density:
- 19 ± 10% kg/m³
- color:
- kremowy
- heat resistance after curing:
- od –60 do +100 ºC
- productivity (free foaming):
- do 45 L
- setting time:
- 2 - 24 h
- storage temperature:
- od +15 do +25 °C
- package:
- 750 ml
Attachments